Friday, December 17, 2010

Two Xzeres 442 Installed in Yachats, OR

Alec Chin and Noah Cardeira land the tail of a 10kW 442 at Angell Job Corp in Yachats, OR. PNE Construction, Sustainable Solutions, Inc., Boyles Electric, and Forsland Crane collaborated to install two 10kW wind generators on 90 ft monopoles at this site. Huge thanks to Tristan Shell-Spurling and Jon Rosche for their invaluable expertise, generousity and sweat.