It was a privilege to contribute to this project, a collaborative effort among Abundant Renewable Energy, Hostetler Construction, Andersen Electric, and Sustainable Solutions.
We chose the ARE 442 for its solid engineering, built right here in Oregon. Technical information is available at www.abundantre.com.
This project was constructed in three stages by participants in ARE's ongoing wind technician training workshops. Special thanks to the ever-gracious homeowners at this site in Newberg, and to all the workshop participants. Your ingenuity and determination helped to make this project possible.
Pics of various stages of the install can be viewed below.
For commercial and residential renewable energy inquires, please contact Sustainable Solutions Unlimited at 503.227.2047 or shoot an email to michael@solutions21st.com.